Solar panels against a blue sky with clouds.

Preparing for Ontario’s MRP Program: What Businesses Need to Know

January 27, 2025

Author:

360 Energy

Ontario’s energy sector faces a critical challenge: insufficient electricity generation to meet forecasted demand, compounded by limited short-term solutions. With increasing electrification and industrial growth, the Independent Electricity System Operator (IESO) is introducing the Market Renewal Program (MRP) in 2025. This initiative aims to make Ontario’s electricity market more predictable and transparent, helping businesses navigate the evolving energy landscape.

While the MRP alone will not solve the looming energy shortage, its framework introduces significant implications for businesses. In this article, we explore the program’s goals, potential impacts, and how companies can prepare for these changes.

Understanding the Problem

Ontario’s electricity grid is nearing capacity. Reports from the IESO highlight that rising demand from electrification efforts, including electric vehicles (EVs), heating systems, and industrial operations, outpaces current generation capabilities. The province’s efforts to expand generation—through renewable projects, natural gas plants, or nuclear refurbishments—face long timelines, leaving a short-term gap in supply.

Key Figures to Consider:

  • Ontario’s electricity demand is projected to increase by 15-20% over the next decade.
  • Peak demand periods are already strained, with warnings of potential outages during extreme weather or high industrial activity.
  • Planned generation projects will take 5-10 years to come online, leaving a critical period of vulnerability.

The MRP does not directly address these generation shortfalls but focuses on creating a more efficient market to improve pricing transparency and predictability for energy consumers.

What is the MRP Program?

The Market Renewal Program (MRP) represents one of the most significant changes to Ontario’s electricity market in decades. Its primary goal is to enhance the efficiency and transparency of energy pricing, ensuring that businesses and other stakeholders have clearer signals for making energy-related decisions.

Key features of the MRP include:

  • Locational Pricing: Energy prices will vary depending on geographic location, with higher charges for regions facing congestion or far from generation sources.
  • Day-Ahead Market System: This system provides businesses with advanced price signals, enabling better planning and budgeting for energy use.
  • Transparency in Market Operations: Improved clarity in pricing and system operations will help businesses understand and respond to market dynamics more effectively.

Unlike previous systems, the MRP focuses on providing market predictability rather than addressing peak demand directly. Existing demand response initiatives, such as curtailment programs, remain under the old market structure.

Potential Impacts on Businesses

The MRP will introduce several changes that could affect business operations:

  1. Geographic Pricing Variability: Businesses in regions with grid congestion or far from power generation sites will face higher energy costs, incentivizing companies to reassess site locations or invest in energy efficiency.
  2. Greater Cost Predictability: The day-ahead market system offers businesses a clearer view of energy costs, enabling more accurate financial planning and operational adjustments.
  3. Pressure to Optimize Energy Use: Companies may feel greater urgency to adopt smart technologies and energy management systems to minimize exposure to fluctuating prices.

How Businesses Can Prepare

To navigate the changes brought by the MRP, businesses should focus on proactive energy management strategies:

  1. Assess Location-Specific Costs: Evaluate how locational pricing might impact operating costs and consider adjustments, such as relocating energy-intensive operations or mitigating costs through efficiency upgrades.
  2. Invest in Predictive Technology: Implement smart energy management tools to track real-time usage and respond to day-ahead pricing signals effectively.
  3. Explore Renewable Integration: On-site renewable energy systems (e.g., solar panels) or energy storage solutions can reduce reliance on grid-supplied electricity during high-cost periods.
  4. Engage with Energy Experts: Work with energy consultants, such as 360 Energy Inc., to develop a tailored strategy for optimizing energy costs and ensuring compliance with new market structures.

What’s at Stake?

Businesses unprepared for the MRP could face rising costs due to locational pricing and inefficient energy practices. However, those who act now to understand and adapt to the new market dynamics stand to benefit from greater predictability, optimized costs, and enhanced resilience in a volatile energy market.

As Ontario grapples with the twin challenges of rising demand and insufficient short-term generation, the MRP offers a foundation for managing energy costs. By taking a proactive approach, businesses can turn this period of transition into an opportunity for growth and innovation.